Efterslægten HF-center
The physical environment at Efterslægtens HF-center has changed in recent years. It had to be renewed, and one of the projects involved a gymnasium / walkway of just under 50m2. The project is a conversion of two gymnasiums from 1939, where it will form the framework for a new study hall, stairs and classrooms.
Future-proof spaces for new forms of collaboration and learning
Inspiration was sought in the existing architecture, and good spaces were to be created that play with those that already exist. The new design is challenging, as it has circular strokes and geometric deviations that create contrast to the simple space.
Project info
Modernization gives crisp structure made of wood
The project is both an interior design and remodeling project, where you want to have an open and crisp structure for the facade, which casts an elegant network of shadows in addition to the rest of the interior. It was created using Tripplex Acoustic Wooden Slats in natural, solid pine.